5.1
|
Residents
of the Reserves have a right to free and normal navigation of the waterways. |
||
5.2
|
In
order to give effect to the continued right to free and normal navigation
by all persons, Manitoba agrees to remove obstructions to navigation
created by the construction of the Footprint River and the Minago River
causeways as soon as practical and in any event not later than two months
after the date of ratification of this Agreement. |
||
5.3 |
Manitoba and/or Hydro undertake to maximize the free and normal use
of the navigable waters (as defined by the Navigable Waters Protection
Act R.S.C. 1970 Chapter N-19) by all persons affected by the Project
and in particular: |
||
5.3.1
|
To
ensure clearing of land in the Nelson House area and in the area between
Footprint Lake and Threepoint Lake in order that flooding wil not interfere
with existing navigation by the population; |
||
5.3.2 |
To
ensure that, in the event that standing trees become a navigation problem
now or in the future, clearing action is performed; |
||
5.3.3
|
To
remove debris of any nature which results from the actual construction
or from the flooding of land or by diversion of waters in the total
area encompassed by the overall Project. |
||
5.4 |
In the event that any claim is submitted to the Arbitrator with respect
to any adverse effect of the Project on navigation, the Arbitrator may,
irrespective of any order he may make in respect of such claim, recommend
to the Minister of Transport, Canada ("the Minister" in this
Article) such measures as the Arbitrator deems may be appropriately
required of Manitoba and/or Hydro by the Minister, for the purpose of
ensuring free and normal navigation of the navigable waters. |
||
5.5
|
Hydro
shall comply with the conditions set out in all Approval Documents issued
to Hydro by the Minister in relation to the Project as these pertain
to actual or potential adverse effects on the communities or the residents
thereof. |
||
5.6 |
In order to give effect to the continued right to free and normal navigation
by all persons, Hydro agrees to construct and maintain a portage facility
at Notigi Dam which will enable users of the waterways to freely and
safely proceed along the waterway now obstructed by the Notigi Dam. |
||