22.1
|
Without
limiting the nature and extent of the remedial works and measures ("works")
contemplated by this Agreement, Hydro agrees that it shall make available
the funds which it estimates to be necessary for the engineering and
construction of works at Nelson House and Cross Lake to the Department
of Indian Affairs and Northern Development in trust for and on behalf
of the Development Corporation referred to in the Memorandum of Understanding
initialled by the parties on July 31, 1977 ("Corporation")
for the account of the Band for which the works are to be directed.
Subject to the provisions of this Article, the Band and the Corporation
shall determine such organization as they may consider appropriate for
the utilization of the funds and shall determine the manner and time
for the construction, if at all, of the works. |
||
22.2
|
In
respect to the remedial works contemplated by the funds made available,
the Bands, the Corporation and Canada shall release and save harmless
Hydro and Manitoba, and the Bands shall release and save harmless Canada,
from any responsibility for construction of and liability with respect
to such works. Hydro shall indicate its views to the Corporation and
the Band as to the significance of the construction of such works and
the appropriate time for their construction. |
||
22.3 |
A fund shall be established as contemplated by Article 12.6 in respect
to the remedial works provided herein, for the works at Nelson House
and Cross Lake, and a letter outlining Hydro's proposal as discussed
will be forthcoming to the parties and the substance thereof incorporated
herein. |
||
22.4
|
In
furtherance hereof it is agreed that: |
||
22.4.1 |
Certain
remedial works identified on Schedule "F" attached hereto
are essential engineering requirements for the operation of the system
and Hydro shall complete these works involving to the maximum possible
degree the residents of the Reserves. |
||
22.4.2 |
In
respect to the remaining remedial works identified on Schedule "G"
attached hereto, Hydro shall make available to the Department of Indian
Affairs and Northern Development in trust for and on behalf of the Corporation
the funding as set forth in Schedule "G" attached hereto,
and the Corporation and the appropriate Band shall undertake at their
discretion such works at such time and in such fashion as they may determine
to be appropriate. |
||
22.4.3 |
In respect to such further and other remedial works pursuant to this
Agreement as may be necessary in any of the five Reserves, unless such
remedial works are essential requirements for the operation of Hydro's
power system, Hydro shall make available necessary funding in the same
manner and on the same terms as set forth in Article 22.4.2. |
||
22.4.4 |
Hydro
shall make available at the request of the Band and/or the Corporation
either such engineering advice and assistance as may be necessary to
complete the works to proper engineering and construction standards
or alternatively provide in the same manner and on the same terms as
provided in Article 22.4.2 the funds necessary to retain such engineering
assistance independently. |
||
22.4.5 |
Any dispute arising as to whether or not other remedial works may be
necessary or as to the accuracy of the cost estimates, or as to whether
or not the work is an essential engineering requirement, shall be referred
to the Arbitrator for determination. |
||